欧美精品国产综合久久_国产免费观看久久黄av片_欧美一级特黄啪啪片免费看_天美影视传媒有限公司官网免费网站大全下载_污污内射久久一区二区欧美日韩_富婆被大肉楱征服小说_国产精欧美一区二区三区_她看向窗外_亚洲成av人片不卡无苍井空

Scan code consultation:
0755-2102 2109
Technology
Technology
Current location: Home Technology Ex tech
Requirements for metal wall thickness around blind holes on explosion-proof enclosures

SINO Testing Services

| 2020-07-30|Return

According to Article 11.6 of GB 3836.2-2010, for non penetrationExplosion proofThe screw holes or double headed bolt holes on the shell wall, and the remaining thickness of the explosion-proof shell wall should be at least one-third of the diameter of the bolt or double headed bolt, with a minimum of 3mm.

 

Q: Does the 'remaining thickness' of the explosion-proof shell wall here refer to the thickness below the hole or the thickness around and below the hole?

 

A: The "remaining thickness" of the explosion-proof shell wall here is explained as follows: when the hole is perpendicular to the shell, only the shell wall below the hole has a thickness requirement (3mm or 1/3 diameter, whichever is larger). This explanation is based on the fact that there is no specific material thickness requirement for the explosion-proof shell, so the material around the hole is not restricted. Explosion proof testing should consider most blind holes, such as impact testing and overvoltage testing.




Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發(fā)消息 1354407946
點擊這里給我發(fā)消息 1354407946